Baton Rouge class (FASA)

From Trekipedia
Revision as of 22:52, 22 October 2019 by Admin (talk | contribs)
Jump to: navigation, search

The Baton Rouge class cruisers were first commissioned on Reference Stardate 1/7008 (August 2196),[1][2][3] and 220 would be built. Between Reference Stardate 1/8708 (August 2244) and 1/9308 (August 2250), the Baton Rouge class was refitted with new warp engines. This timely improvement allowed the ship to continue to serve effectively as a light cruiser in the early months of the Klingon War, until the class was retired on Reference Stardate 1/9808 (August 2256).[1]

FASA Timeline

The Baton Rouge class cruisers were first commissioned on Reference Stardate 1/7008 (August 2170), and 220 would be built. Between Reference Stardate 1/8708 (August 2187) and 1/9308 (August 2193), the Baton Rouge class was refitted with dilithium-moderated warp engines. This timely improvement allowed the ship to continue to serve effectively as a light cruiser throughout the Four Years War, until the class was retired on Reference Stardate 1/9808 (August 2198).[4][1]

Baton Rouge class vessels

FASA Timeline

U.S.S. Baton Rouge  •  U.S.S. Moscow  •  U.S.S. Tehran

Myriad Universes

U.S.S. Baton Rouge  •  U.S.S. Los Angeles


Notes and References

  1. 1.0 1.1 1.2 Theisen, John A. (Author). The Four Years War. Star Trek: The Role Playing Game. Book 2218A . Cover art and illustrations by Dana Knutson. FASA Corporation. 1986.
  2. Goodman, David A. Federation: The First 150 Years. Titan Books, October 2013.
  3. Although the Reference Stardate given in "The Four Years War" would normally convert to 2227, the date was given definitively as 2196 in "Federation: The First 150 Years."
  4. Goldstein, Stan et al (Authors). Spaceflight Chronology. Star Trek. Book. Wallaby Books. 1980.