U.S.S. Achilles NCC-26277 (FASA)
From Trekipedia
The Federation Starship Achilles, a Miranda class vessel,[Notes 1] was constructed to Mark II of the Reliant-type specifications and commissioned in March 2276.[1]
Notes
- ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs namedFASA2302
Cite error: <ref>
tag with name "Miranda" defined in <references>
is not used in prior text.
Ships Named Achilles
EV Timeline
U.S.S. Achilles (Miranda class)
FASA Timeline
U.S.S. Achilles NCC-551 (Cochise class) • U.S.S. Achilles NCC-26277 (Reliant class) • U.S.S. Achilles II NCC-2011 (Excelsior class)
SFU Timeline
Notes and References
Cite error: <ref>
tag defined in <references>
has group attribute "" which does not appear in prior text.
Cite error: <ref>
tags exist for a group named "Notes", but no corresponding <references group="Notes"/>
tag was found