Difference between revisions of "2152 (FASA)"
From Trekipedia
m |
m (Admin moved page FASA Chronology: 2152 to 2152 (FASA)) |
(No difference)
|
Revision as of 04:10, 21 March 2021
Reference Stardate 1/5201 through 1/5212
January
- RSD 1/5201: The Federation's largest propulsion and weaponry testing facility, the Arcturus Test Range, begins operations.[1][2]
Notes and References
- ↑ Goldstein, Stan et al (Authors). Spaceflight Chronology. Star Trek. Book. Wallaby Books. 1980.
- ↑ Theisen, John A. (Author). The Four Years War. Star Trek: The Role Playing Game. Book 2218A . Cover art and illustrations by Dana Knutson. FASA Corporation. 1986.