2148 (FASA)
From Trekipedia
Revision as of 23:01, 20 March 2021 by Admin (talk | contribs) (Admin moved page FASA Chronology: 2148 to 2148 (FASA))
Reference Stardate 1/4801 through 1/4812
February
- RSD 1/4802.20 (20 February): The expensive and ill-fated Tritium class cruiser, U.S.S. Tritium, enters service, never meeting any design specifications, proving to be, in the words of chief engineer Rex Opperman, an "Edsel," as the experimental three-nacelle design proves unworkable. Numerous high-level Star Fleet personnel are discharged as a result, and all six Tritium class ships will be decommissioned within seven years.[1] The Tritium Shuttle, however, fares better, and remains in service until 2173.[2]
Notes and References
- ↑ Theisen, John A. (Author). The Four Years War. Star Trek: The Role Playing Game. Book 2218A . Cover art and illustrations by Dana Knutson. FASA Corporation. 1986.
- ↑ Goldstein, Stan et al (Authors). Spaceflight Chronology. Star Trek. Book. Wallaby Books. 1980.